Photos taken three weeks after the bolts were tightened.
Credits
Owner: Duke Power
Plant: Marshall Steam Station
Project: FGD
Tonnage: 4,900 Tons
Engineering: Shaw Stone & Webser
Fabricators: Steel Fabricators (Buildings) / Structural Steel Services (Ductwork)
G/C Erector: Shaw Constructors
"I LOVE Squirters! I don't know how we ever did a job without them. They eliminate all the bolting arguments. I get about twice as much productivity from the bolting crew. No kidding, I REALLY like them. We never have to go back to a point, because the QA people can see everything's done. No more feeler gages!"
Butch Marler, 15 year veteran steel erection superintendent on Duke Power's Marshall Steam Plant FGD Project, designed and constructed by Shaw Group, Feb. 2005
|