 |
Credits
Fabricator/Erector: Costruzioni Cimolai - Italy
Erection Method: Launch from Tunnell !!
20,000 Tonne, 3180 meters long, Weathering steel (Type III) plate girders, combined highway/railway bridge, black dacromet coated DIN 6914 type III bolts used with Applied Bolting's double black dacromet coated DTI's custom manufactured to suit the DIN 6915 strength nuts, erection beginning in spring 2001, largest steel bridge in the Western hemisphere at that time.
|