Galena Creek - Cathedral Arch on I-580

Credits

Owner: Nevada DOT

Prime Contractor: Edward Kraemer & Sons

Length: With an arch span of 650 feet, a deck length of 1,719 feet, and built 300 feet above the creek, this will be the longest concrete Cathedral Arch bridge in the nation. The steel tubular arch will act as the reinforcement for the concrete arch.

Cost: $40 Million